TRACKING ON · The desert stays desert.
SPROCKET 500
Crown Prism · Concept briefing
SPROCKET 500
Drag to orbit
- Time
- 9:15 AM
- Sun el.
- 54°
- Yaw
- -41°
- Output
- 243 MW
- Lift
- +33%
Tracking
ON · follows sun
Mid-size utility plant made into a landmark. You pay extra in steel and engineering for height, rotation, dual use, and one branded object — not for multi-GW output. Concept figures. Not a financed project. Not a siting study.
Anatomy
Four systems, one object
500 stories · ~2,000 m
A rotating PV face on one side of the shaft. The wall is the generator, not a billboard. Yaw at the bearing turns the face with the sun. Core risers take elevators, cable, and plant systems.
500 stories, approximately 2,000 m. Vertical array on one face of the shaft. Tracking on: the face follows. Tracking off: the wall goes dark and output drops.

Optics
Concentrate first, then split
A prism does not magnify. Concentrate first, then split. The live crown in the stage hides with these same toggles.
Inset · prism alone
A prism does not magnify. Concentrate first, then split.
Rainbow, almost no concentration. Weak, dispersed output.
Why this stack
Parallel desert DNI hits the parabolic primary, then a CPC throat, then a prism that only splits after the flux is already dense. Multi-junction bands take their color; a closed cooling loop takes the rest. The crown is a receiver, not a ground heliostat field.
Explode the live crown above: hide a layer to see the path break.

Power
Nameplate of a mid-size plant
Concept figures. The live stage is a phenomenological model fitted to the 9:15 AM example — not a bankable yield study.
Nameplate
250–350 MW AC
Live output
243 MW
Vs fixed south
+33%
Annual (desert year)
650–900 GWh
Homes (U.S. avg)
60,000–85,000
Capacity factor
28–32%
Tracking lift
+25–40% vs fixed south wall
Water on PV skin
Near zero

Land
The desert stays desert
Heliostat or panel field 1,500–2,000 acres versus podium ~741 acres. Shapes scale by √area so the eye reads land, not a logo.
Live stage is composed for orbit. This plan is to acreage. Scale bar is relative.
Parking
Cars park under the generator
80,000–120,000
Podium radius
977 m
Acreage
~741 acres
Charger load
220 MW
Vs nameplate
Inside nameplate
Default case: 20% of stalls × 11 kW ≈ 220 MW, inside the 250–350 MW nameplate. Dual use, not extra desert.
Environment
Quiet in operation. Heavy up front.
Benefits
- Compact land versus a 1,500–2,000 acre field.
- Low operating water. Near-zero on the PV skin.
- No heliostat burn field on the desert floor.
- Optional on-site EV load under the generator.
- Quiet operation once the plant is turning.
Costs
- Huge steel and concrete. Longer energy payback than a flat farm.
- Crown cooling is closed-loop, not a wet field — still a thermal plant at the top.
- You pay extra in engineering for height, rotation, dual use, and one branded object.
CO₂ avoided vs U.S. mix
250,000–300,000 t/yr
Car-equivalent
50,000–65,000 gasoline cars/yr
Jobs
Peak 8,000–15,000 · perm. 400–800
Comparison
One object versus a mirror farm
| Sprocket 500 | Ivanpah-class CSP | |
|---|---|---|
| Form | One rotating object | Three towers + mirror field |
| Land | Compact podium ~741 acres | 1,500–2,000 acres |
| Ground flux | No ground death-ray field | Heliostat burn field |
| Up-front | More steel, more engineering | More glass on the dirt |


Honest limit
Mid-size utility plant made into a landmark. You pay extra in steel and engineering for height, rotation, dual use, and one branded object — not for multi-GW output. Concept figures. Not a financed project. Not a siting study.
Quiet in operation. Heavy up front. No patented invention is claimed. No multi-GW is promised. Numbers on this page are concept figures for a landmark mid-size utility plant — not a financed project, not a siting study.
A 500-story shaft that turns with the sun. PV skin on the wall. High-flux crown on top. Flared parking podium that charges the cars it holds.